Protected demonstration: synthetic inventory, simulated payment and sample certificates only. No purchase, payment collection or registry instruction occurs.

California disclosure structure

AB 1305 prototype disclosures

Demonstration data only. No project below exists, no credits have been issued or sold, and no emissions reduction or avoidance claim may be made from this information. The fields demonstrate a disclosure structure for legal review; they do not establish compliance.

Seller and methodology

Seller
Future Energy Capital Limited, trading as Future Energy Global
Methodology
Synthetic SAF Book & Claim Demonstration Methodology v0.1
Protocol owner
FEG prototype team — not an approved standard setter
Quantification
Illustrative lifecycle comparison against a fictional fossil-jet baseline; no result is verified
Additionality
Not assessed in this prototype
Durability / reversal
Avoided-emissions concept; no carbon storage or permanence claim
Independent verification
None — demonstration records only
Update date
2 September 2026 (synthetic)

Project records

DEMO-AB1305-001

Circular oils

Project location
Synthetic North Sea blending hub
Project type / pathway
HEFA
Feedstock
Used cooking oil
Start / crediting period
1 Jan 2025–31 Dec 2025 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence

DEMO-AB1305-002

Circular fats

Project location
Synthetic Benelux blending hub
Project type / pathway
HEFA
Feedstock
Waste animal fats
Start / crediting period
1 Jan 2024–31 Dec 2024 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence

DEMO-AB1305-003

Crop residues

Project location
Synthetic Iberian production hub
Project type / pathway
Alcohol-to-jet
Feedstock
Agricultural residues
Start / crediting period
1 Jan 2025–31 Dec 2025 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence

DEMO-AB1305-004

Forestry residues

Project location
Synthetic Nordic production hub
Project type / pathway
Fischer–Tropsch
Feedstock
Fischer–Tropsch feedstock
Start / crediting period
1 Jan 2024–31 Dec 2024 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence

DEMO-AB1305-005

Renewable e-fuel

Project location
Synthetic Alpine e-fuel hub
Project type / pathway
Power-to-liquid
Feedstock
Renewable electricity, water and captured carbon
Start / crediting period
1 Jan 2026–31 Dec 2026 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence

DEMO-AB1305-006

Mixed waste

Project location
Synthetic Pacific Northwest production hub
Project type / pathway
Gasification + Fischer–Tropsch
Feedstock
Sorted municipal solid waste
Start / crediting period
1 Jan 2025–31 Dec 2025 (synthetic)
Annual quantity
100 tCO2e illustrative ceiling; 0 verified
Registry / serials
DEMO registry · no valid serial numbers
Validation / verification
None
Failure contingency
No live sale; test orders may be cancelled or reset
Evidence
No external project evidence